Page 15 - Bosch Hot Water Boilers
P. 15

Hot water boilers | 15






                Equipment

                The UNIMAT hot water boiler UT-M is offered as a   cabinet including the easy-to-operate boiler control BCO.
                complete boiler system including equipment*. The   The integrated terminal box is already wired. Pre-assem-
                basic equipment includes the boiler pressure vessel,   bled, plug-in and coded cable bundles simplify the electri-
                the control and safety components, the burner unit,   cal wiring between the boiler control cabinet and the
                the flue gas heat exchanger or condensing heat     terminal box.
                exchanger, a terminal box and the control switchgear







                                       1     14  13    3        16    15    4                   2         5


























                                     7           8       9        10                                17    12







                1      Control switchgear cabinet with             5   Flue gas heat exchanger ECO – alternatively the flue
                   boiler control BCO                                 gas connection can also be realised lateral or upwards
                2    Supply flow adapter piece with                7   Burner
                   - temperature limiter                           8   Gas regulation module
                   - flow monitor                                  9   Base frame
                   - temperature controller                        10  Insulation with protective shell
                   - level limiter                                 12   Drain shut-off valve, maintenance-free
                   - pressure indicator                            13   Terminal box
                   - pressure limiter (max.)                       14    Sight hole
                   - manostat tube shut-off valve                  15   Injector device for inner temperature boosting
                3   Full-lift safety valve                         16  Inspection opening, water side
                4     Return flow adapter piece                    17   Inspection opening, flue gas side
                   - temperature monitor
                   - connection for safety expansion line


                *The equipment level is variable and can be freely configured to customer requirements.
   10   11   12   13   14   15   16   17   18   19   20