                Equipment

                The UNIMAT hot water boiler UT-HZ is offered as a    cabinet including the easy-to-operate boiler control
                complete boiler system including equipment*. The     BCO. The integrated terminal box is already wired.
                basic equipment includes the boiler pressure vessel,   Pre-assembled, plug-in and coded cable bundles sim-
                the control and safety components, the burner unit,   plify the electrical wiring between the boiler control
                the flue gas heat exchanger or condensing heat       cabinet and the terminal box.
                exchanger, a terminal box and the control switchgear







                                    1    13     2                16        3                4   5   6

























                                         7   8    9        10     11               12         14   17





                1   Control switchgear cabinet with boiler control BCO  5   Flue gas heat exchanger ECO
                2    Supply flow adapter piece with                   6   Flue gas collection chamber
                   - temperature limiter                              7   Burner
                   - flow monitor                                     8   Gas regulation module
                   - temperature controller                           9   Base frame
                   - level limiter                                    10  Insulation with protective shell
                   - pressure indicator                               11  Water circulation guide profiles
                   - pressure limiter (max.)                          12  Drain shut-off valve, maintenance-free
                   - manostat tube shut-off valve                     13  Terminal box
                3   Full-lift safety valve                            14   Sight hole
                4    Return flow adapter piece                        16  Inspection opening, water side
                   - temperature monitor                              17  Inspection opening, flue gas side
                   - connection for safety expansion line






                *The equipment level is variable and can be freely configured to customer requirements.