                   Benefits at a glance

                    Improved efficiency and environmental friendliness through the use of waste heat sources
                    High supply reliability thanks own firing
                    Matched, modular system for easy planning and fast installation
                    Complete system including CHP unit on request
                     Intuitive boiler control based on PLC with very high transparency of operating data
                    Simple commissioning due to pre-parameterised boiler control
                     Easy wiring on-site thanks to plug-in connections
                    Robust, reliable and durable
                    Reduced component diversity with regard to spare parts inventory
                     Service from a single source







                These hot water boilers are conventionally-fired boilers   Additional peak load boilers are normally required if
                based on a 3-pass design, with an additional integrated   waste heat boilers without burner are used. It is often
                smoke tube pass for waste heat utilisation. They are   superfluous due to the self-firing functionality. Further-
                primarily used in combination with CHP units or gas   more, the need of heat exchangers in the flue gas
                turbines. The 4th pass uses hot flue gases from      system of the CHP is reduced. This allows huge
                upstream combustion processes to support the genera-  amounts of money, space and equipment to be saved.
                tion of thermal heat.

                Design                                               Equipment


                The design of our waste heat boilers with burner corre-  The equipment options are identical to that available
                sponds to the basic design of the UT-H series. The boil-  for the UNIMAT hot water boiler UT-H series.
                ers are fitted with an additional integrated smoke tube
                pass (4th pass) for waste heat utilisation.









                                                                                           Water/Condensate
                                                                                           Power
                                                                                           Flue gas


                                                                                        1    4-pass hot water boiler
                                                                                        2    Economizer
                                                                                        3    Heat exchanger
                                                                                        4    CHP
                                                                                        5    Consumer
                                                                                        6    Chimney

                                                                                       Extremely simplified diagram