Page 30 - Bosch Controls and Connectivity
P. 30

30 | Controls and connectivity                                                                                                                                                                              Controls and connectivity | 31






          Application examples – the perfect combination

                                                                                                                                 Application 3: Large industrial operation,
                                                                                                                                 3-shift operation, 7 days per week


          Application 1: small or medium-sized brewery,                                                                          Requirements                                          Implementation
          2-shift operation                                                                                                      ▶  Process heating for production                     ▶   Multi-boiler system with two steam boilers,
                                                                                                                                 ▶  Connection to an existing automation system          each 16 t/h
          Requirements                                          Implementation                                                   ▶  Maximum energy savings                             ▶  High-pressure condensate module
          ▶  Conventional heating for the building              ▶  Heating boiler with control device Control 8000               ▶   Highest possible system availability to avoid     ▶   Boiler controls BCO connected via system
          ▶  Process heating and cooling for production         ▶  Steam boiler with boiler control BCO                            production downtime                                   control SCO
          ▶  No production automation system                    ▶   Central control using system control MEC System                                                                    ▶  Digital efficiency assistant MEC Optimize
          ▶   Energy data monitoring and evaluation of historical   ▶   Energy data monitoring and evaluation using
            system data                                           MEC System                                                     The redundancy of the dual boiler system is a dis-
                                                                                                                                 tinct advantage: this means the system is also highly
                                                                                                                                 efficient even in partial load operation, and mainte-
                                                                                                                                 nance work can be undertaken on the boiler without
                                                                                                                                 interrupting steam supply. Using high-pressure con-
                                                               The MEC System combines existing energy sources                   densate reduces the demand for fresh water and the
                                                               and coordinates the needs of the different consu mers,            system's own consumption for water treatment. The
                                                               removing the need for a costly automation system                  SCO en ables operation without constant monitoring
                                                               connection. Thanks to BAFA and dena certification,                (72 hours) and ensures especially efficient operation
                                                               the brewery energy manager can also use MEC System                thanks to its boiler sequence control. MEC Optimize
                                                               as energy management software, in accordance with                 provides fully automated analysis and evaluation of
                                                               DIN EN 50001.                                                     the system data to make recommendations for actions
                                                                                                                                 to increase operational efficiency. At the same time,
                                                                                                                                 MEC Optimize also provides the relevant section of the
                                                                                                                                 operating instructions. The boiler logbook is maintained
                                                                                                                                 digitally, meaning every step is documented and can
                                                                                                                                 be refe renced by the operator.
          Application 2: Housing association,
          multiple properties in one city

          Requirements                                         Implementation
          ▶  Reliable heat supply for tenants                  ▶  CHP units to cover base-load demand efficiently
          ▶   Low operating costs through an effective boiler and   ▶  Peak load boilers with condensing technology
            local power generation                             ▶   Optimal operation through centralised control via
          ▶   Centralised remote monitoring of all systems        Control 8000
          ▶   Effective route planning for maintenance work    ▶   Remote connection using MEC Remote via UMTS,
          ▶   Active fault notifications sent to on-call service staff   without any additional wired network interfaces
            mobile phones


          The CHP control is securely connected to the
          Control 8000 over a Modbus interface, allowing
            centralised control of both components in one system.
          The CHP module reliably delivers the necessary base
          load, and any increased demand for heating is auto-
          matically supplemented by the peak load boiler. All
          systems can be monitored remotely using MEC Remote
          and maintenance work can be planned in advance. On-
          call service staff are automatically informed via SMS or
          e-mail if a system is reporting a fault, meaning they will
          be on-site as quickly as possible.
   25   26   27   28   29   30   31   32   33   34   35