Project Domestic PEA Total Status
Loan Revenues (as of December 31, 2016)
Current Ongoing Projects
1. Transmission System and Substation 5,295 1,765 7,060 Project Progress : 20.62%
Development Project, Phase 9 (Part 1)
2. Transmission System and Substation 3,405 1,135 4,540 Project Progress : 23.64%
Development Project, Phase 9 (Part 2)
3. Transmission System and Substation 11,314 3,771 15,085 Project Progress : 22.00%
Development Project, Phase 9 (Part 3)
4. Transmission System and Substation 3,360 1,125 4,485 Project Progress : 38.20%
Development Project, Phase 9 (Part 4)
5. The Power Distribution System Reinforcement 12,950 4,320 17,270 Project Progress : 92.92%
Project, Phase 7
6. Distribution System Reliability Improvement 11,365 3,790 15,155 Project Progress : 55.00%
Project, Phase 3
7. Submarine Cable Extension to Electrifed to 820 274 1,094 Submarine cables are laid. Currently
Ko Pha-ngan, Surat Thani Province constructing substations on the island.
Project Progress : 86.15%
8. New Rural Household Electrifcation Project 2,761 926 3,687 Completed for 114,010 households or
86.61%.
9. Remote Rural Household Electrifcation Project 910 305 1,215 Completed for 7,763 households or
66.92%.
10. Distribution System Dispatching Center 3,395 1,135 4,530 Project Progress : 6.13%.
Improvement Project
11. PEA Small Hydropower Development 0 808 808 Currently in the process of hiring consultants
at dame of the Royal Irrigation Department to study designs, details, prepare bidding
Project (10 Locations in Lampang Province, documents, environment work, disseminating
Chiang Mai Province, Rayong Province (2 Locations), project information and provide consultation
Sakon Nakhon Province, Phetchabun Province, during construction.
Songkhla Province and Trat Province (3 Locations)).
12. Smart Grid Development Project in Pattaya, 800 269 1,069 Currently reviewing bidding documents and
Chon Buri Province assessing reference prices.
Project Progress : 1.22%.
13. Transmission and Distribution Development 47,009 15,670 62,679 - The Council of Ministers approved the
Project, Phase 1 project on November 1, 2016.
- Currently in the process of procuring equipment.
14. Power System Development for Special 2,355 785 3,140 - The Council of Ministers approved the
Economic Zone Project, Phase 1 (Tak Province, project on October 12, 2016.
Sa Kaeo Province, Trat Province, Mukdahan - Currently surveying, designing and holding
Province, Songkhla Province and Nong Khai biddings on the contract to construct power
Province) stations.
15. Agriculture Electrifcation Project, Phase 2 1,520 510 2,030 Project Progress : 0.14%