Signifcant Current and Future Investment Projects
                                                                                            (Unit : Million Baht)
                                                    Investment Balance
                         Project                Domestic     PEA      Total              Status
                                                  Loan    Revenues             (as of December 31, 2016)

               Current Ongoing Projects
             1. Transmission System and Substation  5,295     1,765     7,060 Project Progress : 20.62%
                 Development Project, Phase 9 (Part 1)
             2. Transmission System and Substation  3,405     1,135     4,540 Project Progress : 23.64%
                 Development Project, Phase 9 (Part 2)
             3. Transmission System and Substation  11,314    3,771    15,085 Project Progress : 22.00%
                 Development Project, Phase 9 (Part 3)
             4. Transmission System and Substation  3,360     1,125     4,485 Project Progress : 38.20%
                 Development Project, Phase 9 (Part 4)
             5. The Power Distribution System Reinforcement   12,950  4,320  17,270 Project Progress : 92.92%
               Project, Phase 7
             6. Distribution System Reliability Improvement   11,365  3,790  15,155 Project Progress : 55.00%
               Project, Phase 3
             7. Submarine Cable Extension to Electrifed to   820  274  1,094 Submarine cables are laid. Currently
               Ko Pha-ngan, Surat Thani Province                             constructing substations on the island.
                                                                             Project Progress : 86.15%
             8. New Rural Household Electrifcation Project  2,761  926  3,687 Completed for 114,010 households or
                                                                             86.61%.
             9. Remote Rural Household Electrifcation Project  910  305  1,215 Completed  for  7,763  households  or
                                                                             66.92%.
             10. Distribution System Dispatching Center  3,395  1,135   4,530 Project Progress : 6.13%.
                  Improvement Project
             11. PEA Small Hydropower Development      0        808      808 Currently in the process of hiring consultants
               at dame of the Royal Irrigation Department                    to study designs, details, prepare bidding
                  Project (10 Locations in Lampang Province,                 documents, environment work, disseminating
                  Chiang Mai Province, Rayong Province (2 Locations),        project information and provide consultation
               Sakon Nakhon Province, Phetchabun Province,                   during construction.
               Songkhla Province and Trat Province (3 Locations)).
             12. Smart Grid Development Project in Pattaya,   800  269  1,069 Currently reviewing bidding documents and
               Chon Buri Province                                            assessing reference prices.
                                                                             Project Progress : 1.22%.
             13. Transmission and Distribution Development   47,009  15,670  62,679 - The Council of Ministers approved the
               Project, Phase 1                                              project on November 1, 2016.
                                                                             - Currently in the process of procuring equipment.
             14. Power System Development for Special  2,355    785     3,140 - The Council of Ministers approved the
                 Economic Zone Project, Phase 1 (Tak Province,               project on October 12, 2016.
               Sa Kaeo Province, Trat Province, Mukdahan                     - Currently surveying, designing and holding
               Province, Songkhla Province and Nong Khai                     biddings on the contract to construct power
               Province)                                                     stations.
             15. Agriculture Electrifcation Project, Phase 2  1,520  510  2,030 Project Progress : 0.14%



      50     SMART PEA
             Annual Report 2016 Provincial Electricity Authority
   45   46   47   48   49   50   51   52   53   54   55