4. The Environment

                    PEA considers responsibility to the environment
             in every work process, because electricity is a basic public
             utility for the nation. In addition, power plants, power
             transportation and distribution system constructions are
             considered major projects requiring high budgetary
             expenditures and causing signifcant effects on the

             environment and society. Therefore, before commencing
             the aforementioned projects, PEA prepares Environmental
             Impact Assessment (EIA) reports and strictly complies with
             related laws such as the Enhancement and Conservation  of environmental impacts. The aforementioned project
             of National Environment Quality Act of B.E. 2535 (1992 A.D.)  carries out environmentally friendly offce activities such

             and PEA needs to receive permission from the government  as reducing electricity, fuel and water consumption, reusing
             agencies involved and approval from the Council of  Ministers. and recycling to reduce waste, reducing and discontinuing
                    In 2016, many projects held public hearings such  the use of hazardous products or chemicals in offces to
             as the project to produce power from waste disposal in the  reduce release of pollution to the environment in addition to
             municipality of Phra Nakorn Si Ayutthaya Province. In this  reducing greenhouse gas emissions. Furthermore,
             project, PEA was assigned by the Ministry of Interior to  offce supply procurement considers certifcation of

             invest in the construction of power plants to produce power  environmentally friendly products such as products  with
             from waste disposal by the municipality of Phra Nakorn  green labels, No. 5 energy conservation labels and high
             Si Ayutthaya Province in order to produce electricity. The  effciency labels, including offce employment, which must
             project is expected to be able to dispose of community  select personnel or outside agencies with quality or
             waste at 300 tons per day.                       achievement of specifc standards in environmental

                    In constructing power transmission stations and  management for concurrence with green offce criteria.
             power distribution systems, PEA has standards concurrent  The Green Offce Project was created with the unity of
             with engineering and safety principles. Furthermore, PEA  every employee to modify behaviors and create 24
             refers to national and international standards for designing  Green Offces of PEA.  Thus, PEA received an award
             stations, transmission systems  and distribution systems  (G: Gold) for outstanding agencies meeting standard
             such as standards of the  International Electrotechnical  Green Offce criteria created by the Department of
             Commission (IEC), the Institute of Electrical and Electronics  Environment Quality Promotion, Ministry of Natural

             Engineers (IEEE) and the Engineering Institute of Thailand  Resources and Environment. Furthermore, PEA was able
             (EIT).                                           to reduce greenhouse gas emissions from offces in
                    In addition, PEA has prepared the Green Offce  2014 – 2016 by 4,454.76 tons of carbon dioxide
             Project of the Department of Environment Quality Promotion to  equivalents (tCO e) and received outstanding awards
                                                                            2
             promote and support every agency under PEA to use resources  for 3 consecutive years (2014 – 2016). In 2014, PEA’s

             with knowledge of values, environmental friendliness, reduced  offces received awards for 4 offces, 12 offces in 2015
             greenhouse gas emissions and prepare offces to become  and 24 offces in 2016 or a total of 40 offces. In the
             environmentally friendly at the international level in  addition to   future, PEA is determined to expand the effects of the
             sustainably modifying employee behaviors  with awareness  Green Offce Project to cover PEA offces in every province.






                                                                                                   SMART PEA   69
                                                                             Annual Report 2016 Provincial Electricity Authority
   64   65   66   67   68   69   70   71   72   73   74